top of page
微信图片_20241119160412.jpg

Edison will build 6.1 MW photovoltaic plant at Bekaert plant for on-site PPA

Writer: Energy BoxEnergy Box

Edison Next and Bekaert have signed a twelve-year on-site PPA for the plant in the province of Cagliari. The photovoltaic system will cover an area of ​​approximately 23,000 square meters.


Edison Next and Bekaert have signed an on-site Power Purchase Agreement (PPA) lasting 12 years, which provides for the installation of a photovoltaic system with a total power of 6.1 MW at the Bekaert plant in Macchiareddu (Cagliari). Bekaert is an international group, expert in steel wire processing and coating technologies.


The plant will cover an area of ​​approximately 23,000 square meters. It should have an annual electricity production of more than 11.2 GWh, the Edison Group company said.


Bekaert Sardinia should self-consume 93% of the renewable electricity generated. The plant is expected to meet more than 20% of the plant's current energy demand.


The on-site PPA represents a solution through which Edison Next designs, installs and manages a photovoltaic system directly at the customer's premises.



Comentarios


Related News

微信图片_20241212143003.jpg
白.png
白.png

                                       is a vertical media company dedicated to the Renewable Energy . we are one of the largest influential media in the world.

To enhance the business cooperation across the land and inland and to promote green energy, ENERGY BOX EVENTS are held around the world such as Pan Europe, Africa & Middle Eats, LATAM and Asia. Up to date, we have had 30+ events on record across the world. We are committed to subverting the traditional media marketing model, inspiring a unique and professional customized team. And not only that, there exist sales consulting, projects development, financing, Webinar, meetings, interviews and peer to peer services.

  • Facebook
  • LinkedIn
  • LinkedIn

©2020-2024 Produced by Energy Box.  

bottom of page